...








Branches of the Open Joint-Stock Company


Except the central apparatus (machinery) and industrial service that are situated in Ivano-Frankivsk 17 district branches of electric power net (DEPN) that are situated in the regional centers according to the area principle integrate the open joint-stock company “Prykarpattyaoblenergo”.

The part of regional energy management is served by centralized forces of industrial services. High voltage lines service serves all electric power lines (voltage 35-110 KV); service of substations serves all substations (voltage 110 KV) in part of main equipment major repairs; insulation, defense and tests service measures and controls insulations and other.



Branch establishment:
Open joint-stock company “Bogorodchany DEPN”
Director of the company: Mykhaylo Kozachyshyn.



A Bogorodchany district electric power net is responsible for the delivering of electric power to 23, 961 thousand customers of Bogorodchany district; among them there are 691 enterprises and establishments.
Annual entrance of electricity to Bogorodchany DEPN is 59,3 million kV per hour, minimal month entrance in summer – 4,2 million kV per hour;
maximum month entrance in winter – 6 million kV per hour.
Compressor station is the largest customer of electricity in the district, its part in the general volume of consumption is 85% of all consumption electricity.
Maximum summer loading is 11, 4 megawatt, maximum winter loading – 10, 5 megawatt.
Bogorodchany DEPN gets electricity from join energy system of Ukraine over the 5 transmission substations 35/110kV, with the general transformers’ power- 53, 8 mega – volt amperes, and also over the 305 transformers substations (10/04 kV) with set transformers’ power - 56,22 mega-volt amperes and separating system (10-0,4 kV) over the cables and air lines (length-1396,2 km).



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Bogorodchany district electric power net”
54 Shevchenko Street,
Bogorodchany settlement,
Ivano-Frankivsk region
77701, Ukraine,
ph/fax (03471) 2-14-62
Dispatcher’s ph. (03471) 2-13-69
e-mail: rem19@if.energy.gov.ua



Branch establishment:
Open joint-stock company “Verkhovyna DEPN”
Director of the company: Andriy Melnyk.


Verkhovyna DEPN is responsible for the carrying of electric energy to the 11, 13 thousand customers of Verkhovyna district; 503 of the customers are district businesses.
Annual entrance of electricity to Verkhovyna region is 24,8 million kV per hour.
Minimal month entrance in summer is 1, 4 million kV per hour; maximum month entrance in winter – 3, 2 million kV per hour. 95% of all electricity is delivered to the inhabitants of the district.
Maximum summer loading is 1, 4 mega-volt amperes, and maximum winter loading – 5, 3 mega-volt amperes.
Verkhovyna DEPN receives electricity from join energy system of Ukraine with the help of 3 transmission substations that are rated at 35-110kV, with the transformers power 14, 4 mega – volt amperes, and also over 231 transformer substations (10/0,4kV) with transformers’ power 22,838 mega-volt amperes and separating system (10-0,4 kV) over the cables and air lines (1440 km ).



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Verkhovyna district electric power net”
15 Bandera Street,
Verkhovyna settlement,
Ivano-Frankivsk region
Ukraine, 78700
ph /fax (03432) 2-16-86
Dispatcher’s ph. (03432) 2-15-70
e-mail: rem20@if.energy.gov.ua



Branch establishment:
Open joint-stock company “Galych DEPN”
Director of the company: Taras Gnatyuk.


Galych DEPN is responsible for the delivering of electricity to the 25, 18 thousand customers of Galych district; 718 of the customers are district enterprises and establishments.
Annual entrance of electricity to Galych district is 51,6 million kV per hour.
Minimal month entrance in summer is 3, 3 million kV per hour; maximum month entrance in winter – 5, 5 million kV per hour.
Burshtyn thermoelectric power station is the biggest customer of electric power in the district; it uses 22, 39 % of all incoming electricity. On the second place is CE (communal enterprise) “Zhytlovyk” – 6,9 %.
Maximum summer loading is 3, 7 mega-volt amperes, and maximum winter loading – 5, 3 mega-volt amperes.
Galych DEPN receives electricity from join energy system of Ukraine over the 7 transmission substations (35-110kV), with the general transformers power (94, 8 mega – volt amperes), and also over the 364 transformer substations (10/0,4kV) with set transformers’ power- 66,468 mega-volt amperes and separating system (10-0,4 kV) over the cables and air lines (length -1334,2 km).



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Galych district electric power net”
40 Galych Street,
village Zaluka,
Galych district
Ivano-Frankivsk region
Ukraine, 77160
ph/fax (03431) 3-07-80
Dispatcher’s ph (03431) 3-07-50
e -mail: rem21@if.energy.gov.ua



Branch establishment:
Open joint-stock company “Gorodenka DEPN”
Director of the company: Sergiy Borteychuk.


Gorodenka DEPN is responsible for the delivering of electricity to the customers of Gorodenka district. There are 21,884 thousand customers; among them- 664 enterprises and establishments of the district.
Annual entrance of electricity to Gorodenka DEPN is 36, 9 million kV per hour. Minimal month electricity entrance in summer is 2, 4 million kV per hour; maximum month entrance in winter – 4,0 million kV per hour. Population is the biggest customer of electricity in the district. 93 % of incoming electricity is used by the inhabitants.
Maximum summer loading is 5, 1 mega-volt amperes, and maximum winter loading – 8, 3 mega-volt amperes.
Gorodenka DEPN receives electricity from join energy system of Ukraine over 5 transmission substations that are rated at 35-110kV, with the general transformers power (48, 6 mega – volt amperes), and also over the 352 transformer substations (10/0,4kV) with set transformers’ power- 58,853 mega-volt amperes and separating system (10-0,4 kV) over the cables and air lines ( 1320,4 km length).



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Gorodenka district electric power net”
7 Ya. Stetsko Street,
Gorodenka town,
Ivano-Frankivsk region
Ukraine, 78100
ph/fax (03430) 2-15-55
Dispatcher’s ph (03430) 2-13-27
e-mail: rem22@if.energy.gov.ua



Branch establishment:
Open joint-stock company “Dolyna DEPN”
Director of the company: Yaroslav Maksymiv.


Dolyna DEPN is responsible for the delivering of electricity to the customers of Dolyna district. There are 31,277 thousand customers; among them- 1077 district enterprises and establishments.
Annual entrance of electricity to Dolyna DEPN is 176,9 million kV per hour.
Minimal month electricity entrance in summer is 11,3 million kV per hour; maximum month entrance in winter – 18,6 million kV per hour. “Dolynanaftogaz” is the biggest customer of electricity in the district. 62 % of all incoming electricity is used by it.
Maximum summer loading is 15, 5 mega-volt amperes, and maximum winter loading – 20, 4 mega-volt amperes.
Dolyna DEPN receives electricity from join energy system of Ukraine over 6 transmission substations that are rated at 35-110kV, with the general transformers power (124, 7 mega – volt amperes), and also over 291 transformer substations (10/0,4kV) with transformers’ power- 44, 446 mega-volt amperes and separating system (10-6-0,4 kV) over the cables and air lines (length – 1308,2 km ).



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“ Dolyna district electric power net”
4 Yavornytskyy Street,
Dolyna town,
Ivano-Frankivsk region
Ukraine, 77504
ph/fax (03477) 2-86-01
Dispatcher’s ph. (03477) 2-86-02
e-mail: rem23@if.energy.gov.ua



Branch establishment:
Open joint-stock company “Kalush DEPN”
Director of the company: Oleg Tutka.


Kalush DEPN is responsible for the delivering of electricity to the customers of Kalush district. There are 45,995 thousand customers; among them- 1295 district enterprises and establishments.
Annual entrance of electricity to Kalush DEPN is 738,7 million kV per hour.
Minimal month electricity entrance in summer is 48,1 million kV per hour; maximum month entrance in winter – 77,7 million kV per hour.
Closed joint-stock company “Lulor” is the biggest customer of electricity in the district. 72, 2 % of all incoming electricity is used by it.
Maximum summer loading is 103 mega-volt amperes, and maximum winter loading – 89, 7 mega-volt amperes.
Kalush DEPN receives electricity from join energy system of Ukraine over 12 transmission substations that are rated at 35-110kV, with the general transformers power 169, 9 mega – volt amperes, and also over 364 transformer substations (10/0,4kV) with set transformers’ power - 96,601 mega-volt amperes and separating system 10-6-0, 4 kV over the cables and air lines ( 1544,5 km length).



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“ Kalush district electric power net”
10 Obyizna Street,
Kalush town,
Ivano-Frankivsk region
Ukraine, 77300
ph/fax (03472) 2-71-92
Dispatcher’s ph. (03472) 2-26-48
e-mail: rem25@if.energy.gov.ua



Branch establishment:
Open joint-stock company “Kolomiya TDEPN
(Kolomiya town district of electric power net)”
Director of the company: Bogdan Geytota.


Kolomiya TDEPN (Kolomiya town district of electric power net) is responsible for the delivering of electricity to the customers of Kolomiya town and the district. There are 35,857 thousand customers; among them- 1457 enterprises and establishments of the town.
Annual entrance of electricity to Kolomiya TDEPN is 118,9 million kV per hour.
Minimal month electricity entrance in summer is 7,6 million kV per hour; maximum month entrance in winter – 13,3 million kV per hour.
Kolomiya water supplying organization is the biggest customer of electricity.
15, 38 % of all incoming electricity is used by it.
Maximum summer loading is 7, 8 mega-volt amperes, and maximum winter loading – 12, 1 mega-volt amperes.
Kolomiya TDEPN (Kolomiya town district of electric power net) receives electricity from join energy system of Ukraine over the 8 transmission substations that are rated at 35-110kV, with the general transformers power 112 mega – volt amperes, and also over 303 transformer substations (10/0,4kV) with transformers’ power- 80,104 mega-volt amperes and separating system 10-6-0,4 kV over the cables and air lines (length 1259,88 km).



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Kolomiya town district of electric power net”
4 Rusyna Street,
Kolomiya town,
Ivano-Frankivsk region
Ukraine, 78200
ph/fax (03433) 2-02-61
Dispatcher’s ph. (03433) 2-24-77
e-mail: rem26@if.energy.gov.ua




Branch establishment:
Open joint-stock company “Kolomiya DEPN”
Director of the company: Vasiliy Boychuk.


Kolomiya DEPN is responsible for the delivering of electricity to the customers of Kolomiya district. There are 26,308 thousand customers; among them- 608 district enterprises and establishments.
Annual entrance of electricity to Kolomiya DEPN is 49,8 million kV per hour.
Minimal month electricity entrance in summer is 3,2 million kV per hour; maximum month entrance in winter – 5,8 million kV per hour.
Population is the biggest customer of electricity in the district. 50,4 % of all incoming electricity is used by the inhabitants.
Maximum summer loading is 3,1 mega-volt amperes, and maximum winter loading – 5, 2 mega-volt amperes.
Kolomiya DEPN receives electricity from join energy system of Ukraine over 10 transmission substations ( 35-110kV), with the general transformers power (108,2 mega – volt amperes), and also over 363 transformer substations (10/0,4) with set transformers’ power- 56,334 mega-volt amperes and separating system 10-0,4 kV over the cables and air lines (length- 160,53 km).


Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Kolomiya district electric power net”
115 b I. Franko Street,
Kolomiya town,
Ivano-Frankivsk region
Ukraine, 78200
ph/fax (03433) 2-26-61
Dispatcher’s ph. (03433) 2-37-52
e-mail: rem27@if.energy.gov.ua



Branch establishment
Open joint-stock company “Kosiv DEPN”
Director of the company: Veleriy Bodnarchuk.


Kosiv DEPN is responsible for the delivering of electricity to the customers of Kosiv district. There are 36,525 thousand customers; among them- 1025 district enterprises and establishments.
Annual entrance of electricity to Kosiv DEPN is 72,8 million kV per hour.
Minimal month electricity entrance in summer is 4,5 million kV per hour; maximum month entrance in winter – 9,1 million kV per hour.
The inhabitants use 49 % of all incoming electricity.
Maximum summer loading is 4,3 mega-volt amperes, and maximum winter loading – 5,9 mega-volt amperes.
Kosiv DEPN receives electricity from join energy system of Ukraine with the help of 7 transmission substations (35-110kV), with the general transformers power 58,6 mega – volt amperes, and also over 459 transformer substations
(10/0, 4) with transformers’ power- 57,340 mega-volt amperes and separating system 10-0,4 kV over the cables and air lines (length 2453,64 km).


Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Kosiv district electric power net”
1 Energetykiv street,
Kosiv town,
Ivano-Frankivsk region
Ukraine, 78600
ph/fax (03478) 2-12-23
Dispatcher’s ph. (03478) 2-37-89
e-mail: rem28@if.energy.gov.ua



Branch establishment:
Open joint-stock company “Lysets DEPN”
Director of the company: Sergiy Danylyuk.


Lysets DEPN is responsible for the delivering of electricity to the customers of Tysmenytsya district. There are 31,473 thousand customers; among them- 973 district enterprises and establishments.
Annual entrance of electricity to Lysets DEPN is 190,6 million kV per hour.
Minimal month electricity entrance in summer is 15,1 million kV per hour; maximum month entrance in winter – 17,6 million kV per hour.
Open joint-stock company “Ivano-Frankivsktsement” is the biggest customer of electricity in the district. 64,4 % of all incoming electricity is used by it.
Maximum summer loading is 18,6 mega-volt amperes, and maximum winter loading – 20,5 mega-volt amperes.
Lysets DEPN receives electricity from join energy system of Ukraine over 12 transmission substations that are rated at 35-110kV, with the general transformers power 157,6 mega – volt amperes and also through 409 transformer substations that are rated at 10/0,4kV with the general transformers power 64,949 mega – volt amperes and separating system 10-0,4 kV over the cables and air lines (1405,11 km).



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Lysets district electric power net”
4 Sichovi Striltsi street,
settlement Lysets
Ivano-Frankivsk region
Ukraine, 77455
ph/fax (03436) 4-11-37
Dispatcher’s ph. (03436) 4-12-60
e-mail: rem29@if.energy.gov.ua



Branch establishment:
Open joint-stock company “Nadvirna DEPN”
Director of the company: Dmytro Bunyak.


Nadvirna DEPN is responsible for the delivering of electricity to the customers of Nadvirna district. There are 31,646 thousand customers; among them- 946 district enterprises and establishments.
Annual entrance of electricity to Nadvirna DEPN is 175,6 million kV per hour.
Minimal month electricity entrance in summer is 10,6 million kV per hour; maximum month entrance in winter – 17,6 million kV per hour.
Open joint-stock company “Naftokhimik Prykarpattya” is the biggest customer of electricity in the district. 59, 9 % of all incoming electricity is used by it.
Maximum summer loading is 18, 9 mega-volt amperes, and maximum winter loading – 19, 9 mega-volt amperes.
Nadvirna DEPN receives electricity from join energy system of Ukraine with the help of 9 transmission substations that are rated at 35-110kV, and also through 306 transformer substations that are rated at 10/0,4kV with the general transformers facilities that are rated at 65,757 mega – volt amperes and separating system 10-6-0,4 kV over the cables and air lines of 1468,54 km length.



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Nadvirna district electric power net”
49 Ivan Franko Street,
Nadvirna town
Ivano-Frankivsk region
Ukraine, 78 400
ph/fax (03475) 2-32-50
Dispatcher’s ph. (03475) 2-25-63
e-mail: rem30@if.energy.gov.ua



Branch establishment:
Open joint-stock company “Rogatyn DEPN”
Director of the company: Igor Rykhlevych.


Rogatyn DEPN is responsible for the delivering of electricity to the customers of Rogatyn district. There are 20,989 thousand customers; among them- 589 district enterprises and establishments.
Annual entrance of electricity to Rogatyn DEPN is 40,0 million kV per hour.
Minimal month electricity entrance in summer is 2,9 million kV per hour; maximum month entrance in winter – 4,0 million kV per hour.
Rogatyn gas-compressor station is the biggest customer of electricity in the district.4, 7 % of all incoming electricity is used by it.
Maximum summer loading is 3,35 mega-volt amperes, and maximum winter loading – 4,2 mega-volt amperes.
Rogatyn DEPN receives electricity from join energy system of Ukraine with the help of 9 transmission substations that are rated at 35-110kV, with the general transformers power 56,8 mega – volt amperes and also over 332 transformer substations that are rated at 10/0,4kV with the general transformers power 46,063 mega – volt amperes and separating system 10-0,4 kV over the cables and air lines of 1440,99 km length.



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Rogatyn district electric power net”
2 Ugryn Bezgrishnyy Street,
Rogatyn town
Ivano-Frankivsk region
Ukraine, 77 000
ph/fax (03435) 2-14-05
Dispatcher’s ph. (03435) 2-15-00
e-mail: rem31@if.energy.gov.ua



Branch establishment:
Open joint-stock company “Rozhnyativ DEPN”
Director of the company: Mykhaylo Koretskyy.


Rozhnyativ DEPN is responsible for the delivering of electricity to the customers of Rozhnyativ district. There are 24,371 thousand customers; among them- 871 district enterprises and establishments.
Annual entrance of electricity in Rozhnyativ DEPN is 85,3 million kV per hour. Minimal month electricity entrance in summer is 5,0 million kV per hour; maximum month entrance in winter – 9,5 million kV per hour.
Population is the biggest customer of electricity in the district.
Inhabitants use 88 % of incoming electricity.
Maximum summer loading is 6, 2 mega-volt amperes, and maximum winter loading – 8, 5 mega-volt amperes.
Rozhnyativ DEPN receives electricity from join energy system of Ukraine over 6 transmission substations that are rated at 35-110kV, with the general transformers power 77,5 mega – volt amperes and also over the 283 transformer substations that are rated at 10/0,4kV with the general transformers power 43,045 mega – volt amperes and separating system 10-0,4 kV over the cables and air lines ( 1086,36 km.)



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Rozhnyativ district electric power net”
12 Naftovykiv Street,
Rozhnyativ town
Ivano-Frankivsk region
Ukraine, 77 600
ph/fax (03474) 2-05-93
Dispatcher’s ph. (03474) 2-08-44
e-mail: rem32@if.energy.gov.ua



Branch establishment:
Open joint-stock company “Snyatyn DEPN”
Director of the company: Ivan Bordun.


Snyatyn DEPN is responsible for the delivering of electricity to the customers of Snyatyn district. There are 25,312 thousand customers; among them- 712 district enterprises and establishments.
Annual entrance of electricity into Snyatyn DEPN is 63,2 million kV per hour. Minimal month electricity entrance in summer is 4,3 million kV per hour; maximum month entrance in winter – 6,9 million kV per hour.
Branch establishment “ Zaluchya Spyrtzavod” is the biggest customer of electricity in the district. 4, 6 % of all incoming electricity is used by it.
Maximum summer loading is 4, 7 mega-volt amperes, and maximum winter loading – 6, 6 mega-volt amperes.
Snyatyn DEPN receives electricity from join energy system of Ukraine with the help of 9 transmission substations that are rated at 35-110kV, with the general transformers power 79,3 mega – volt amperes and also over 391 transformer substations that are rated at 10/0,4kV with the general transformers power 64,437 mega – volt amperes and separating system 10-0,4 kV over the cables and air lines ( 1419,3 km length ).



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Snyatyn district electric power net”
5 Gogol Street,
Snyatyn town
Ivano-Frankivsk region
Ukraine, 78 300
ph/fax (03476) 2-27-10
Dispatcher’s ph. (03476) 2-14-90
e-mail: rem33@if.energy.gov.ua



Branch establishment:
Open joint-stock company “ Tlumach DEPN”
Director of the company: Zenoviy Kulynych.


Tlumach DEPN is responsible for the delivering of electricity to the customers of Snyatyn district. There are 18,625 thousand customers; among them- 525 district enterprises and establishments.
Annual entrance of electricity into Tlumach DEPN is 28,9 million kV per hour.
Minimal month electricity entrance in summer is 1,9 million kV per hour; maximum month entrance in winter – 3,4 million kV per hour.
Population is the biggest customer of electricity in the district. Inhabitants used 57, 5 % of all incoming electricity.
Maximum summer loading is 2,0 mega-volt amperes, and maximum winter loading – 2,5 mega-volt amperes.
Tlumach DEPN receives electricity from join energy system of Ukraine with the help of 7 transmission substations that are rated at 35-110kV, with the general transformers power 53,9 mega – volt amperes and also over 331 transformer substations that are rated at 10/0,4kV with the general transformers power 47,292 mega – volt amperes and separating system 10-0,4 kV over the cables and air lines ( length-1345,4 km.)



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Tlumach district electric power net”
2 Promyslova Street,
Tlumach town
Ivano-Frankivsk region
Ukraine, 78 000
ph/fax (03479) 2-16-38
Dispatcher’s ph. (03479) 2-11-80
e-mail: rem34@if.energy.gov.ua



Branch establishment:
Open joint-stock company “ Yaremcha DEPN”

Director of the company: Andriy Kumgyr.


Yaremcha DEPN is responsible for the delivering of electricity to the customers of Yaremcha district. There are 16,436 thousand customers; among them- 536 district enterprises and establishments.
Annual entrance of electricity to Yaremcha DEPN is 58,4 million kV per hour.
Minimal month electricity entrance in summer is 3,1 million kV per hour; maximum month entrance in winter – 7,6 million kV per hour.
32, 3 % of incoming electricity is used by the inhabitants.
Maximum summer loading is 3,2 mega-volt amperes, and maximum winter loading – 6, 2 mega-volt amperes.
Yaremcha DEPN receives electricity from join energy system of Ukraine over 5 transmission substations that are rated at 35-110kV, with the general transformers power 47,3 mega – volt amperes and also over 213 transformer substations that are rated at 10/0,4kV with the general transformers power 38,619 mega – volt amperes and separating system 10-0,4 kV over the cables and air lines 988,3 km length.



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Yaremcha district electric power net”
240 Svoboda Street,
Yaremcha town
Ivano-Frankivsk region
Ukraine, 78 500
ph/fax (03434) 2-23-88
Dispatcher’s ph. (03434) 2-22-50
e-mail: rem35@if.energy.gov.ua



Branch establishment:
Open joint-stock company “Ivano-Frankivsk DEPN”
Director of the company: Volodymyr Polish .


Ivano-Frankivsk DEPN is responsible for the delivering of electricity to the customers of Ivano-Frankivsk city. There are 72,578 thousand customers; among them- 2,508 district enterprises and establishments of region.
Annual entrance of electricity to Ivano-Frankivsk DEPN is 349,0 million kV per hour. Minimal month electricity entrance in summer is 23,5 million kV per hour; maximum month entrance in winter – 36,8 million kV per hour.
Ivano-Frankivsk “Teplokomunenergo” is the biggest customer of electricity in the district. 4, 24 % of incoming electricity is used by it.
Maximum summer loading is 26,7 mega-volt amperes, and maximum winter loading – 40,7 mega-volt amperes.
Ivano-Frankivsk DEPN receives electricity from join energy system of Ukraine with the help of 9 transmission substations that are rated at 35-110kV, with the general transformers power 280, 2 mega – volt amperes and also over 347 transformer substations that are rated at 10/0,4kV with the set general transformers power 202,504 mega – volt amperes and separating system 10-0,4 kV over the cables and air lines of 906,9 km length.



Contacts:
Branch of the open joint-stock company “Prykarpattyaoblenergo”
“Ivano-Frankivsk district electric power net”
7 Maksymovych Street,
Ivano-Frankivsk city
Ukraine, 76007
ph/fax (03422) 6-84-91
Dispatcher’s ph. (03422) 2-33-23
e-mail: rem24@if.energy.gov.ua





Mission of the ocompany :
to bring the light to every house, apartment; to provide with convenient life conditions and with good conditions of business in Pre-Carpathian region, to guarantee stable development of prosperity of company’s partners and stockholders with the help of professional staff of like-minded power engineering specialists.

The professional team of high -
qualified specialists is headed by the leaders that master the special knowledge and skills of power engineering.

Power engineering specialists form the collective of specialists
with the same convictions and values. Everyone deals with the same business according to the company’s interest.